Jubilee Place

Jubilee Place

Successful Complete project

ALL DATA AND COMMUNICATIONS was engaged for the commissioning and installation of the communications system on levels 1-5 for Perigon, IWG Jubilee.
An Operation and Maintenance Manual was prepared to provide guidance and recommendations to assist

      • Users of the building
      • Managers of the building and services
      • IT contractors to carry out works
      • Employees who carry out maintenance, repair, or new works within the building in the understanding, running and maintenance of the services installed.
      • The building itself is Iconic in its design

Solution

Cat6A Siemon was the perfect solution in conjunction with their space-saving 48 port patch panels.
Cabling of SALTO access control gave the building managers easier control over the high volume turnover of different tenants.

Process

Using underfloor tray to service 80% of the work area and catenary support for high levels the cabling network is made up of 3 comms rooms split over 5 levels with optical fibre back bone.