ALL DATA AND COMMUNICATIONS was engaged for the commissioning and installation of the communications system on levels 1-5 for Perigon, IWG Jubilee.
This Operation and Maintenance Manual has been prepared to provide guidance and recommendations to assist
Cat6A Siemon was the perfect solution in conjunction with their space saving 48 port patch panels.
Cabling of SALTO access control gave the building managers easier control over high volume turnover of different tenants.
Using under floor tray to service 80% of the work area and catenary support for high level the cabling network is made up of 3 comms rooms split over 5 levels with optical fibre back bone.
Copyright © 2022 All Data & Communications